Aurora Project 2002-02 – RWIS Equipment Monitoring System, Phase 1

Project Overview

The objective of this project was to provide Aurora member agencies with an automated means of problem identification and reporting for their RWIS equipment. Functionality of an existing Minnesota Department of Transportation system was used as a base to design the desired system. The end result of this project was a web-based solution that each member state could choose to host or have someone host for a fee.

Project Results

Information on this effort can be found at: http://www.aurora-program.org/projectdetail.cfm?projectID=26.

Leave a Reply

You must be logged in to post a comment.